Jump to content

Warden station

Coordinates: 43°42′41″N 79°16′47″W / 43.71139°N 79.27972°W / 43.71139; -79.27972
From Wikipedia, the free encyclopedia

Warden
General information
Location701 Warden Avenue,
Toronto, Ontario
Canada
Coordinates43°42′41″N 79°16′47″W / 43.71139°N 79.27972°W / 43.71139; -79.27972
PlatformsCentre platform
Tracks2
Connections
  •  8  Broadview
  •  9  Bellamy
  •  16  McCowan
  •  17  Birchmount
  •  68  Warden
  •  69  Warden South
  •  102  Markham Rd
  •  135  Gerrard
  •  902  Markham Road Express
  •  968  Warden Express
Construction
Structure typeElevated
Parking1,071 spaces
AccessibleNo
Other information
WebsiteOfficial station page
History
OpenedMay 10, 1968; 56 years ago (1968-05-10)
Passengers
2022[1]12,635
Rank57 of 70
Services
Preceding station Toronto Transit Commission Following station
Victoria Park
towards Kipling
Line 2 Bloor–Danforth Kennedy
Terminus
Location
Map

Warden is a station on Line 2 Bloor-Danforth of the Toronto subway in Toronto, Ontario, Canada. It is located at the southeast corner of St. Clair Avenue East and Warden Avenue. The station is located perpendicular to St. Clair Avenue East, and is the only Line 2 station with a north–south alignment.

The main pedestrian street entrance is on the east side of Warden, with another entrance from St. Clair East along a walkway on the west side of the elevated tracks. Vehicle entry to the passenger pick up and drop off entrance is on the south side of St. Clair east of Warden, exiting on to Warden south of St. Clair East.

The station is on four levels: the subway platform is on the upper floor, the bus concourse to the connecting routes is below it, the two collector entrances and the concourse are found above street level, and the two entrances and the bus platforms are on the lower floor.

1,071 parking spaces are located at this station for commuter use, with 920 in the North Lot and 151 in the South Lot.[2]

History

[edit]
Wall tiles at Warden station

Warden station was opened in 1968 in what was then the Borough of Scarborough, and served as the eastern terminus for Line 2 Bloor–Danforth for 12 years until the extension to Kennedy was completed in 1980.

Until 1973, TTC buses and subway trains serving the station were in separate fare zones and so the turnstiles and collector booths were placed between the bus bays and the subway platforms. When the zones were abolished, the layout was reconfigured to bring the buses inside the station's fare-paid area; one collector booth, left isolated inside the fare-paid zone, became an information booth.

The station's previous address was 3276 St. Clair Avenue East. Since around 2013-14, it has been changed to its present address, 701 Warden Avenue.

Future redevelopment

[edit]

Work started in 2022 to rebuild the bus terminal and to make the station accessible.[3][4] The station is one of the last subway stations yet to be made accessible, due to the complexity of the station layout and its multiple levels.[5] Both commuter parking lots are proposed to be redeveloped by the city government.[6] In October 2021, the city announced that agreement had been reached with Tridel to build 600 residential units and a child care centre on the north parking lot.[7] Construction is expected to be completed by the end of 2025.[8]

Subway infrastructure in the vicinity

[edit]
Aerial view of the exterior of the station

After exiting the station eastbound towards Kennedy station, the track returns to a tunnel at the Chestnut Portal, where it continues on its diagonal alignment under the former Canadian National Railway (CNR) spur line.

There is a crossover west of the station from when it was Line 2's eastern terminus which is still used occasionally to short turn trains. There is also a small siding and storage shed west of the crossover on the south side of the above-ground tracks, which continue along the track bed of the former CNR line all the way to Victoria Park station.

Nearby landmarks

[edit]

Nearby landmarks include the Providence Healthcare, Warden Woods Park, Warden Hilltop Community Centre and Pine Hills Cemetery. It is near much vacant industrial land (including the former site of Centennial College and Warden Woods Mall/Power Centre) where major redevelopment is expected over the coming years, including numerous new housing developments on the former Power Centre property.[9] It is also near the Toronto District School Board high school W.A. Porter C.I., which brings about 700 students in the station each year.[citation needed]

Surface connections

[edit]
Entrances to the bus platforms

When the subway is closed, passengers may board or disembark from buses at the intersection of Warden Avenue and St. Clair Avenue. None of these routes are accessible to those with disabilities as the only connection between the subway and the bus terminal is via stairs.

TTC routes serving the station include:

Bay number Route Name Additional information
1 17A Birchmount Northbound to Highway 7
(Rush hour service)
17B Northbound to Steeles Avenue East via Wintermute Blvd
(Rush hour service)
17C Northbound to Steeles Avenue East
2 9 Bellamy Northbound to Scarborough Centre station
3 102A Markham Road Northbound to Progress Avenue/Centennial College
102B Northbound to Steeles Avenue East
102C Northbound to Steeles Avenue East via Dynamic Drive
(Rush hour service)
102D Northbound to Major Mackenzie Drive
4 902 Markham Road Express Northbound to Steeles Avenue East via Centennial College
(Weekday service)
5 16 McCowan Northbound to Scarborough Centre station
6 8 Broadview Southbound to Broadview station via O'Connor Drive
69B Warden South Southbound to Kingston Road via Birchmount Road
7 69A Warden South Southbound to Kingston Road via Warden Avenue
135 Gerrard Westbound to Main Street station
8 68A Warden Northbound to Steeles Avenue East
68B Northbound to Major Mackenzie Drive
968 Warden Express Northbound to Steeles Avenue East
(Rush hour service)
9 Line 2 Shuttle bus

References

[edit]
  1. ^ "Subway ridership, 2022" (PDF). Toronto Transit Commission. Retrieved May 4, 2024. This table shows the typical number of customer-trips made on each subway on an average weekday and the typical number of customers travelling to and from each station platform on an average weekday.
  2. ^ "Warden Station". www.ttc.ca. Archived from the original on April 16, 2022. Retrieved April 16, 2022.
  3. ^ Adler, Mike (February 3, 2022). "Scarborough's Warden Station gets a long-awaited remake, starting with elevators in 2022". The Toronto Star. ISSN 0319-0781. Archived from the original on April 19, 2022. Retrieved April 19, 2022.
  4. ^ "TTC to begin Easier Access construction at Museum Station; lane restrictions on Queen's Park". Toronto Transit Commission. August 11, 2022. Archived from the original on August 12, 2022.
  5. ^ "Major Redevelopment of Warden Subway Station Planned | UrbanToronto". urbantoronto.ca. Archived from the original on April 19, 2022. Retrieved April 19, 2022.
  6. ^ "December 18 2013 Board Commuter Parking Lot Strategy". www.ttc.ca. December 18, 2013. Archived from the original on April 18, 2022. Retrieved April 18, 2022.
  7. ^ "City of Toronto and CreateTO announce development partners for two Phase One Housing Now sites to build much needed affordable and market rental housing". City of Toronto. October 19, 2021. Archived from the original on April 19, 2022. Retrieved April 19, 2022.
  8. ^ "Easier Access Program Schedule".
  9. ^ "Planning & Development". July 14, 2017. Archived from the original on December 6, 2004. Retrieved December 31, 2004.
[edit]

Media related to Warden station at Wikimedia Commons